Mobile Bridge relocation in Valencia Port
Valencia
Location: Valencia (Spain)
Developer: Valencia Port Authority
Budget: 11.015.266,19 €
Execution time: 8 months
Characteristics
Execution of a swing mobile bridge for road by maximum re using of materials from previous bascule mobile bridge for rail transport.
The key figures of the works are:
Metallic estructure: 1.650 t
Cutting and removal of the existing weight counter and existing bridge deck
Movements and removal of the bridge
HReinforced concrete HA-30 for counteracting weights: 1.400 m3
Connecting bolts: 30.018 uts.
Bridge floor width: 18 m
Total bridge length: 140 m
Span between joints: 99,20 m
Joints capacity: 3.000 t
Turning carriages
Foundations: 34 m deep sheet pile wall: 2.794 m3
Trenching: 12.944 m3
Selected filling: 23.491 m3
Reinforced concrete HA-35 in perimeter walls: 2.893 m3