Small Boats Marina . Gibraltar
Gibraltar
Location: Gibraltar
Developer: Gibraltar Joinery and Building Services
Budget: 12.800.000,00 €
Execution time: 14 months
Characteristics
Construction of reinforced concrete floating caissons casted in Cyes Floating Dock. Caissons include external and internal windows in order to attenuate energy inside the chambers reducing wave reflection and improving operability inside the port basin. The scope of work includes sinking caissons on its final position and the execution of the superstructure on top of the caissons.
The key figures of the works are:
Reinforced concrete floating caissons.
Tipe A: Length 51m, Beam 15 m, Depth 10,5 m
Tipe B: Length 36m, Beam 15 m, Depth 10,5 m
Tipe C: Length 41m, Beam 15 m, Depth 10,5 m
Concrete 19.725 m³.
Steel reinforcement: 1.775.320 kg.
Precasted slabs execution
Concrete: 404 m³.
Steel reinforcement: 44.000 kg.
Slab execution
Concrete: 825 m³.
Steel reinforcement: 67.000 kg.
Capping beam execution: 1.155 ml.
Concrete: 3.384 m³.
Steel reinforcement: 288.300 kg.