Lineal quay in north shore of Gandía Port. “Los Borgia” quay
Gandía (Valencia)
Location: Gandía, Valencia (Spain)
Developer: Marinas Cyes
Budget: 2.568.744,62 €
Execution time: 7 months
Characteristics
250 m long sheet pile quay for the mooring of 32 megayachts. Facilities, services and pavements.
Sheet pile
The key figures of the works are:
Front AZ-14 of 12 m: 3.213 m2
Back AZ-13 of 3 m: 812 m2
Steel ST 52-3 anchors: 69.110 kg
Rubble mound and rock embankment behind quay: 7.798 m2
Dredging: 13.942 m3
Reinforced concrete HA-30 at edge quay beam: 186 m3
Bollards: 67 uds.
Concrete blocks 10 t: 34 uts.
Installations: water supply, sanitary, lighting and electric
Facilities and pavements
Home > Proyects > Docking and Mooring Works > Lineal quay in north shore of Gandía Port. “Los Borgia” quay
The Docking and Mooring Works, the so-called Wharves, allow ships or vessels to approach in the protected area between land and sea to carry out port activities, such as loading and unloading goods, and passenger and provisions transport, among others.
View all
Level space and commercial quays sheltered by Botafoc Breakwater at Ibiza Port
Ibiza

Southern Quay of the Southern Dock of the Sagunto Port
Valencia

Quay Prat construction, Barcelona Port, Phase I
Barcelona

Bulk Cargo Terminal Infrastructure, Phase I
Ploce (Croacia)

Modernization works of Solid Bulk Terminal of Puerto Cortes, Honduras
Puerto Cortés

Berth for large vessels at the docks of Poniente. Palma de Mallorca
Mallorca

Cruise dock in the Port of Valencia Extension, Phase I
Valencia

Western Quay southern stretch Sagunto Port extension
Valencia

Strengthening and upgrading of the first section of Muelle de Levante in the Port of Valencia
Valencia

Valencia Port Inner Dock Customs Quay widening (America’s Cup 2007)Valencia Port Inner Dock Customs Quay widening (America’s Cup 2007)
Valencia

Lineal quay in north shore of Gandía Port. “Los Borgia” quay
Valencia