Western Quay southern stretch Sagunto Port extension
Sagunto, Valencia
Location: Sagunto, Valencia (Spain)
Developer: Valencia Port Authority
Budget: 14.410.521,72 €
Execution time: 12 months
Characteristics
Project consisting of the execution of a Ro-Ro berth, and a 240 m long new quay by means of floating caissons and a 10,000 m2 south berth level space.
The key figures of the works are:
Dredging: 992.743 m3
Granular filling: 719.277 m3
Rubble mound bedding layer, riprap: 31.807 t
Reinforced Concrete floating caissons: 10 uds.
Quay superstructure, edge quay & back beam
Concrete HA-30 5.836 m3
Steel frame: 270.354 kg
Hot agglomerate asphalt: 9.925 t
Home > Proyects > Docking and Mooring Works > Western Quay southern stretch Sagunto Port extension
The Docking and Mooring Works, the so-called Wharves, allow ships or vessels to approach in the protected area between land and sea to carry out port activities, such as loading and unloading goods, and passenger and provisions transport, among others.
View all
Level space and commercial quays sheltered by Botafoc Breakwater at Ibiza Port
Ibiza

Southern Quay of the Southern Dock of the Sagunto Port
Valencia

Quay Prat construction, Barcelona Port, Phase I
Barcelona

Bulk Cargo Terminal Infrastructure, Phase I
Ploce (Croacia)

Modernization works of Solid Bulk Terminal of Puerto Cortes, Honduras
Puerto Cortés

Berth for large vessels at the docks of Poniente. Palma de Mallorca
Mallorca

Cruise dock in the Port of Valencia Extension, Phase I
Valencia

Western Quay southern stretch Sagunto Port extension
Valencia

Strengthening and upgrading of the first section of Muelle de Levante in the Port of Valencia
Valencia

Valencia Port Inner Dock Customs Quay widening (America’s Cup 2007)Valencia Port Inner Dock Customs Quay widening (America’s Cup 2007)
Valencia

Lineal quay in north shore of Gandía Port. “Los Borgia” quay
Valencia