Cruise dock in the Port of Valencia Extension, Phase I
Valencia
Location: Valencia (Spain)
Developer: Valencia Port Authority
Budget: 22.387.096,99 €
Execution time: 19 months
Characteristics
The works carried out include the construction of two quays with a total length of 870 m, and the adjacent esplanade of 83,000 m². Paving works, Installations and necessary equipment for the terminal operation.
The key figures of the works are:
Dredging inTrench: 188.867 m³.
Rock bedding layer
Quarry material: 380.002 Tn.
Rocks 50-100 kgs: 90.424 Tn.
Rocks 500-1000 kgs: 38.448 Tn.
Reinforced concrete floating caissons: 16 units .
6 units: 54,588*10,43*15 m.
2 units: 50,938*10,43*15 m.
8 units: 54,945*10,43*15 m.
Concrete: 39.210 m³.
Steel reinforcement: 1.685.986 kg.
Quarry material quay backfill: 128.295 Tn.
Quarry material dumped by maritime works: 109.908 Tn.
General filling: 332.096 m³.
Quarry material in esplanade: 140.043 m³.
Urbanisation: 83.300 m² + 4.350 m².
Capping beam execution
Concrete: 15.127 m³.
Steel reinforcement: 744.767 kg.
Berthing and mooring elements
Bollards 250 Tons: 48 uds.
Double Shield Fender type SC1600H: 29 uds.
Home > Proyects > Docking and Mooring Works > Cruise dock in the Port of Valencia Extension, Phase I
The Docking and Mooring Works, the so-called Wharves, allow ships or vessels to approach in the protected area between land and sea to carry out port activities, such as loading and unloading goods, and passenger and provisions transport, among others.
View all
Level space and commercial quays sheltered by Botafoc Breakwater at Ibiza Port
Ibiza

Southern Quay of the Southern Dock of the Sagunto Port
Valencia

Quay Prat construction, Barcelona Port, Phase I
Barcelona

Bulk Cargo Terminal Infrastructure, Phase I
Ploce (Croacia)

Modernization works of Solid Bulk Terminal of Puerto Cortes, Honduras
Puerto Cortés

Berth for large vessels at the docks of Poniente. Palma de Mallorca
Mallorca

Cruise dock in the Port of Valencia Extension, Phase I
Valencia

Western Quay southern stretch Sagunto Port extension
Valencia

Strengthening and upgrading of the first section of Muelle de Levante in the Port of Valencia
Valencia

Valencia Port Inner Dock Customs Quay widening (America’s Cup 2007)Valencia Port Inner Dock Customs Quay widening (America’s Cup 2007)
Valencia

Lineal quay in north shore of Gandía Port. “Los Borgia” quay
Valencia